HAULING ROAD GEOMETRY AND CURVE RADIUS USING AASHTO AT PT PRO INTERTECH INDONESIA SORONG CITY WEST PAPUA PROVINCE
GEOMETRI JALAN ANGKUT DAN JARI-JARI TIKUNGAN MENGGUNAKAN TEORI AASHTO PADA PT PRO INTERTECH INDONESIA KOTA SORONG PROVINSI PAPUA BARAT
Keywords:
geometry, hauling roadAbstract
Hauling road is an important aspect to support hauling activities in a mining operation. Better hauling road conditions will optimalize production, where is consistent with production plans and targets. The calculation of road conditions should be adjusted to the needs. The road geometry is a part of road planning which focuses on the physical condition of the road so that it can fulfill the road function. In addition to the geometry of the hauling roads, water can also affect the condition of the hauling roads. Therefore, it is important to conduct an evaluation of the hauling road conditions. Based on the calculation results, the straight road width is 8,575 meters, the hauling road width at the bend is 19,356 meters, while the straight road width in the field is about 7.6 meters and for curves in the field about 9 meters. From the field processed data, it is indicated that the existing hauling roads at PT Pro Intertech Indonesia mining operation has not fully met the hauling road requirements. Therefore, it is necessary to widen the hauling road in the operation area.
Downloads
Published
Versions
- 2022-12-01 (2)
- 2022-04-01 (1)
How to Cite
Issue
Section
Copyright (c) 2020 Hamdan Tri Sanjaya, Ricardo O. M. Hutapea

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.






